DEMO SITE. Not a real business. Generated to test a page pipeline; the number does not connect to anyone.
Northpoint Electrical8000 0003

Rewiring Jurong West

Rewiring in Jurong West is normally driven by age, added load or a consumer unit that no longer meets current requirements, rather than by a single fault.

Why this is different here

HDB began planning the Jurong West new town in 1984, and the first flats in the wider Jurong area were completed at Taman Jurong in 1963. Flats of that generation were wired for the electrical load of their time, so the recurring work here is added circuits, more socket outlets, and consumer units that predate modern residual current protection.

What actually happens

Need it dealt with now?

8000 0003